Logistics
With the current COVID-19 outbreak, all of the university resources and wood shops have closed. This has forced me to become a little more resourceful when fabricating my project. Luckily I have already purchased all the materials I will need for Home Depot. Also, fortunately, my dad has many tools that I can use to help fabricate my project. Specifically, he has a table saw that I can borrow that will be used to cut the wooden dowels I have purchased and he has a power drill that I can use to drill holes through the dowels to create the leg assembly. Overall, I should be able to completely finish my project on time but It will just require a little more work.
Timeline
I have provided an overall timeline below. However, to be more specific during fabrication:
- From 3/18 – 3/25
- Cut wooden dowels in half
- Drill holes for the hanger bolt and eye bolt
- Finish leg assembly
- From 3/26 – 4/08
- Screw in eye screws
- Create paracord seat