According to the timeline that I had created, I am a little bit behind schedule. Currently, I have all the parts I need except for the water pump. Finding the right size pump with to fit the needs of my project is a little harder than anticipated. Nonetheless, the base is cut to dimension and the supports are attached. My next step is to cut the PVC pipe to the right dimensions and drill holes so that it can be attached to the supports. If the water pump continues to cause delays I may abandon that part of the project and use a sink as a water source instead.
5 Comments. Leave new
I think you will be able to get back on schedule and finish with everything you had hoped too. Just try and partition some time out to work solely on this project.
I actually just decided to add water pumps to my project last second. I’m a little worried I’ll have similar issues. I’m sure both of our projects will turn out great either way!
I’d love to know more about your project! Do you have any design drawings? Please post them.
Evan,
I believe that you will still be able to get back on schedule. If you don’t find the right size, I recommend buying a small adapter to get the size you need.
It sounds like you will be able to get back on schedule, even though it might be hard as other classes take up alot of time at the end of the semester. Using a sink would not be that bad, as you could always add a pump later on.